At Insight Structural Engineers, we are proud of our achievements. We have listed key projects that show the breadth of our experience over the past decade.
Please click on a category below to learn more.
|
| |
"Brent provided an extremely efficient structure while ascertaining the client's unique requirements."
Rhonda Howard
Assistant Vice President
Lowe Enterprises
|
|
|
|
| |
IMAX West Coast Headquarters
Santa Monica, California2 |
|
 |
Project Views: 01 | 02 | 03 | 04
|
Description
- Executive offices
- Three screening theaters
- Post production laboratories
- Manufacturing
- Film storage/distribution
- 60,000 sf of new steel framed floors
- Completed in 2000
Scope
- Provided full structural engineering and construction administration services
Achievements
- Worked with team to meet project goals
- Collaborated closely with the architect to design a sophisticated glass entry, wing walls, cantilevered stairway, large floor openings and clerestory windows
- Repaired and strengthened half of the original damaged exterior walls to treat building as renovation (improved project schedule)
- Utilized concrete masonry walls at screening rooms for seismic resistance and acoustical performance
- Designed structure to accommodate partial future
Brent Blackman was the lead engineer on this project while at Degenkolb Engineers.
|
|
|